MODEL HYBRID FLOWSHOP 2 STAGE WITH JOHNSON’S RULE DISPACTHING TO MINIMIZE MAKESPAN
dc.contributor.author | Anwar, Asep | |
dc.contributor.author | Rochman, Didit Damur | |
dc.contributor.author | Rahmana, Arief | |
dc.date.accessioned | 2021-02-10T03:14:53Z | |
dc.date.available | 2021-02-10T03:14:53Z | |
dc.date.issued | 2020 | |
dc.description.abstract | Hybrid Flowshop (HFS) is a development scheduling model of flowshop scheduling problems. Currently PT. XX which is a manufacturing company that produces MT (Mono Twine) mesh products using the HFS production concept. The HFS process at PT XX is the Ringrope (Stage 1) and Netting (Stage 2) process. The Ringrope process consists of 2 machines arranged in parallel which then the results will be processed Netting. The settlement method in this research is the optimization method by making a mathematical model by sorting using the Johnson method. The results of the study showed the sequence of processes on stage 1 and on stage 2 with makespan was 1354.51 hours. | en_US |
dc.identifier.issn | 1475-7192 | |
dc.identifier.uri | http://repository.widyatama.ac.id/xmlui/handle/123456789/12304 | |
dc.language.iso | en | en_US |
dc.publisher | International Journal of Psychosocial Rehabilitation, Vol.24, Issue 02 | en_US |
dc.subject | Hybrid Flowshop | en_US |
dc.subject | Optimization | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Makespan Minimization | en_US |
dc.title | MODEL HYBRID FLOWSHOP 2 STAGE WITH JOHNSON’S RULE DISPACTHING TO MINIMIZE MAKESPAN | en_US |
dc.type | Article | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Asep Anwar - Model Hybrid Flowshop 2 Stage with Johnson's Rule Dispatching to Minimize Makespan.pdf
- Size:
- 253.26 KB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: