MODEL HYBRID FLOWSHOP 2 STAGE WITH JOHNSON’S RULE DISPACTHING TO MINIMIZE MAKESPAN

No Thumbnail Available
Date
2020
Journal Title
Journal ISSN
Volume Title
Publisher
International Journal of Psychosocial Rehabilitation, Vol.24, Issue 02
Abstract
Hybrid Flowshop (HFS) is a development scheduling model of flowshop scheduling problems. Currently PT. XX which is a manufacturing company that produces MT (Mono Twine) mesh products using the HFS production concept. The HFS process at PT XX is the Ringrope (Stage 1) and Netting (Stage 2) process. The Ringrope process consists of 2 machines arranged in parallel which then the results will be processed Netting. The settlement method in this research is the optimization method by making a mathematical model by sorting using the Johnson method. The results of the study showed the sequence of processes on stage 1 and on stage 2 with makespan was 1354.51 hours.
Description
Keywords
Hybrid Flowshop, Optimization, Scheduling, Makespan Minimization
Citation