ANALYSIS OF CONTROL OF COSTS AND TIME WITH EARNED VALUE METHOD ON ROAD MAINTENANCE PROJECTS IN PALMERAH DISTRICT, WEST JAKARTA
dc.contributor.author | Radhitya Akbar, Sandy | |
dc.contributor.author | Setiawan, Asep | |
dc.contributor.author | Istambul, M. Rozahi | |
dc.contributor.author | Siddiq, Raden Herdian Bayu Ash | |
dc.date.accessioned | 2023-03-08T08:34:30Z | |
dc.date.available | 2023-03-08T08:34:30Z | |
dc.date.issued | 2019 | |
dc.description.abstract | Control in a construction project generally involves three main aspects, namely: cost, time and human resources. This study uses Network Planning analysis as a control function with the Critical Path Method (CPM) method in calculating the difference in cost and time needed to complete the work with a planned budget and schedule. This study also tried to implement an integrated control function, namely the Earned Value Method for a construction project. Based on the analysis and calculation in the 8th week (eight) of the total duration of the project, the analysis produces CPI value = 1.06 which shows that the performance of contractor's expenditure costs is more efficient than the planned budget. The description of the final condition of the project also shows that there is a residual budget value of Rp 321,642,608.01 or 5.55% of the total value of the overall project cost budget or Budgeted At Completion (BAC) which is an advantage for the contractor. The analysis also produces SPI value = 0.94 which means that the time performance index is of good value but the execution of the work is a little slower than the overall planned schedule. | en_US |
dc.identifier.uri | http://repository.widyatama.ac.id/xmlui/handle/123456789/15753 | |
dc.publisher | Horizon Research Publishing | en_US |
dc.subject | Critical Path Method | en_US |
dc.subject | Earned Value Method | en_US |
dc.subject | Metode Nilai Hasil | en_US |
dc.subject | ACWP | en_US |
dc.subject | BCWP | en_US |
dc.subject | BCWS | en_US |
dc.subject | BAC | en_US |
dc.subject | CPM | en_US |
dc.title | ANALYSIS OF CONTROL OF COSTS AND TIME WITH EARNED VALUE METHOD ON ROAD MAINTENANCE PROJECTS IN PALMERAH DISTRICT, WEST JAKARTA | en_US |
dc.type | Article | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- 01 Analysis of Control of Cost and Time With Earned Value Method on road Maintenance Projects in Palmerh District, West Java.pdf
- Size:
- 252.05 KB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: