DETERMINATION OF INTERVAL PREVENTIVE CARE SULPHATE SODIUM PRODUCTION MACHINE WITH RELIABILITY CENTERED MAINTENANCE (RCM) APPROACH (Case Study at PT SPV Purwakarta)

dc.contributor.authorMargana, Riki Ridwan
dc.contributor.authorKomarudin, Udin
dc.date.accessioned2021-02-20T03:47:22Z
dc.date.available2021-02-20T03:47:22Z
dc.date.issued2020
dc.description.abstractPT SPV is a company engaged in manufacturing that has a vision to be a company that produces quality sodium sulphate products until 2021. Historical data for 2017 and 2018 show the sodium sulphate production machine, which is a Centrifuge machine that functions to separate solids and liquids from sodium sulphate solutions has value the biggest downtime is 148.5 hours which results in disruption of the production process. The high value of downtime is caused by the company not having scheduled maintenance activities so that the machine often stops suddenly when operating. The purpose of this study was to determine the preventive maintenance intervals of the sodium sulphate production machine using the Reliability Centered Maintenance (RCM) approach. Where the RCM method will be integrated with the Failure Mode Effect Analysis (FMEA) method which is used as a failure mode analysis that occurs by calculating the highest Risk Priority Number (RPN) value on the machine and then calculating the damage time interval as a basis for determining the maintenance schedule to be performed. Based on the results of the study obtained the results of the failure mode analysis of centrifuge machines and critical components that most often experience damage, namely the second basket stage component. The second basket stage will experience sudden damage every 1814 hours based on the MTTF value and it is found that the average repair time of the second basketball stage component is 16.54 hours based on the MTTR value. The results of determining the treatment time interval with the criteria for minimizing downtime is 65 days for the maintenance time interval. Maintenance cost savings of Rp.4,108,778.5 or 74.10% when compared to the cost of corrective maintenance or scheduling of maintenance of the previous pusher centrifuge machine.en_US
dc.identifier.issn0038-111X
dc.identifier.urihttp://repository.widyatama.ac.id/xmlui/handle/123456789/12695
dc.language.isoenen_US
dc.publisherSolid State Technology Volume: 63 Issue: 3en_US
dc.subjectFailure Mode Effect Analysis (FMEA)en_US
dc.subjectReliability centered maintenance (RCM)en_US
dc.subjectMean Time to Failure (MTTF)en_US
dc.subjectMean Time to Repair (MTTR)en_US
dc.titleDETERMINATION OF INTERVAL PREVENTIVE CARE SULPHATE SODIUM PRODUCTION MACHINE WITH RELIABILITY CENTERED MAINTENANCE (RCM) APPROACH (Case Study at PT SPV Purwakarta)en_US
dc.typeArticleen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Riki Ridwan Margana - Determination of Interval Preventive Care Sulphate Sodium Production Machine with Reliability Centered Maintenance (RCM) Approach.pdf
Size:
238.25 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: