Perencanaan Dan Pengendalian Persediaan Pada CV. K. Mulya Plastik Dengan Meminimasi Total Ongkos Persediaan Bahan Baku (Studi kasus di CV. K. Mulya plastik)

Widyatama Repository

Perencanaan Dan Pengendalian Persediaan Pada CV. K. Mulya Plastik Dengan Meminimasi Total Ongkos Persediaan Bahan Baku (Studi kasus di CV. K. Mulya plastik)

Show full item record

Title: Perencanaan Dan Pengendalian Persediaan Pada CV. K. Mulya Plastik Dengan Meminimasi Total Ongkos Persediaan Bahan Baku (Studi kasus di CV. K. Mulya plastik)
Author: Riyadi, Erik Slamet
Abstract: In manufacturing companies to supply management is very important. Inventory is an asset which includes the goods belonging to the enterprise with the intent to sell within a certain business period or raw materials in a production process and supply have an influence on the operations function, marketing and finance. In this study, the problems discussed was the planning and control of raw material supply in CV. K. Mulya Plastik raw materials which are of scrab cable, which is kind of Compound Beku (CBk), Compound Bubuk (CBb) and Compound Kupasan (CKp) in order to know the lot size and frequency of the economic order during the 6 months ahead so as to minimize the total cost of inventory raw materials at current conditions. Inventory method used model of economic order quantity (EOQ). Lot size for this type of raw materials as much as CBk 10.239 Kg, CBb 15.005 Kg and CKp 13.979 Kg of reservation frequency CBb and CBk many as 4 times the order for interval time of 1.5 months, for raw materials CKp performed 3 times with intervals reservation every 3 month and the total cost for each type of raw material for CBk Rp. 101.421.320, CBb Rp.86.674.749 and CKp Rp.66.250.087, while the current conditions on the total cost of inventory for each type of raw material for CBk Rp. 104,301,392, CBb Rp. Rp 87,676,348 and CKp Rp. 66,828,510. Based on the results of the application of EOQ method, CV. K. Mulya Plastik can save inventory costs for each type of raw material for CBk Rp.2.880.072, CBb Rp. Rp 1.001.599 and CKp Rp. 578.423.
Description: In manufacturing companies to supply management is very important. Inventory is an asset which includes the goods belonging to the enterprise with the intent to sell within a certain business period or raw materials in a production process and supply have an influence on the operations function, marketing and finance. In this study, the problems discussed was the planning and control of raw material supply in CV. K. Mulya Plastik raw materials which are of scrab cable, which is kind of Compound Beku (CBk), Compound Bubuk (CBb) and Compound Kupasan (CKp) in order to know the lot size and frequency of the economic order during the 6 months ahead so as to minimize the total cost of inventory raw materials at current conditions. Inventory method used model of economic order quantity (EOQ). Lot size for this type of raw materials as much as CBk 10.239 Kg, CBb 15.005 Kg and CKp 13.979 Kg of reservation frequency CBb and CBk many as 4 times the order for interval time of 1.5 months, for raw materials CKp performed 3 times with intervals reservation every 3 month and the total cost for each type of raw material for CBk Rp. 101.421.320, CBb Rp.86.674.749 and CKp Rp.66.250.087, while the current conditions on the total cost of inventory for each type of raw material for CBk Rp. 104,301,392, CBb Rp. Rp 87,676,348 and CKp Rp. 66,828,510. Based on the results of the application of EOQ method, CV. K. Mulya Plastik can save inventory costs for each type of raw material for CBk Rp.2.880.072, CBb Rp. Rp 1.001.599 and CKp Rp. 578.423.
URI: http://repository.widyatama.ac.id/xmlui/handle/123456789/1495
Date: 2010


Files in this item

Files Size Format View Description
cover.pdf 1021.Kb PDF View/Open cover
abstrak.pdf 500.4Kb PDF View/Open Abstrak
cover.pdf 1021.Kb PDF View/Open cover
bab1-2.pdf 13.68Mb PDF View/Open Bab I - II
bab3-4.pdf 11.61Mb PDF View/Open Bab III - IV
bab5-6.pdf 6.928Mb PDF View/Open Bab V - VI

This item appears in the following Collection(s)

Show full item record